* Replace primary air cleaner when dust valve restriction indicator gauge shows a vacuum of 25 in. H
2
O.
** Change the oil and oil filter after the first 100 hours, then every 500 hours. If not using John Deere Plus 50 II
engine oil, the interval must be decreased to every 250 hours.
RESETTING THE MAINTENANCE ALARMS
The Power Zone™ controller will display a warning message when the unit is due for maintenance or service. The
maintenance or service intervals are set at 250, 500, and 3000 hours of engine running time. Once the unit has been
serviced, the appropriate maintenance alarm reminder needs to be reset. The following procedure demonstrates
how to reset the maintenance alarms:
1. With the unit shut down, move the Control Power switch to the ON (I) position. After initialization, the controller
will toggle automatically to the Home screen.
2. Press , , , or to enter the maintenance screens.
3. Press and O simultaneously. The next screen will display the Configuration menu.
4. Press to move the cursor (blue highlighted text) down to the Maintenance group.
5. Press to access the sections. Press to highlight the Maintenance section.
6. Press to access the parameters and highlight the maintenance alarm that needs to be reset.
7. Press to select the editable parameters. The cursor will highlight “Not Reset” under the selected maintenance
alarm. Press to highlight “Reset”.
8. Press to reset the selected maintenance alarm.
Note: If the selected maintenance alarm does not need to be reset, press to highlight “Not Reset” and press
to return to the parameters section.
1. To perform additional maintenance alarm resets, repeat steps 6-8.
2. To save changes, press and hold for five seconds. To discard changes made, press and hold O for
five seconds.
Replace Fuel Filter Elements
Check Engine Mounts
Check Air Intake Hoses, Connections, and System
Check Engine Electrical Ground Connection
Check Automatic Belt Tensioner and Belt Wear
Check Cooling System
Lubricate Leveling Jack(s)
Check Generator Drive Plate Torque (refer to page 43)
Test Thermostats
Replace Air Cleaner Elements
Replace Alternator and Fan Belts
Check Fuses
Add Coolant
Check Electrical Wiring and Connections
Item Daily
250
Hrs.
500
Hrs./12
Months
3000
Hrs./ 36
Months
As
Required
Zobrazit stránku 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 59 60

Komentáře k této Příručce

Žádné komentáře